# [Can You Implement New Changes While Keeping Daily Operations at Full-Speed?](https://escolasopticsconsulting.com/blog/can-you-implement-new-changes-while-keeping-daily-operations-at-full-speed)

 Written by [John Escolas](https://escolasopticsconsulting.com/blog/author/john-escolas) | Nov 20, 2026, 3:22:21 PM

As a consultant, much of [my work](https://escolasopticsconsulting.com/optics-consulting-services) involves either helping clients implement new processes successfully or guiding them through significant organizational changes. In both situations, success often depends on preparing the team to sustain itself while maintaining day-to-day operations.

 

Take helping a customer with double side lapping and polish parts thin parts, under 1mm, for example. Every time I help a client with this struggle, the main issue they face is the delicate parts break during polishing, but the issue itself is very seldom in the polishing part of the process. We often need to take several steps back in the process to find the root cause of why the parts are breaking.

## To Push or Pause

The challenge is that you rarely have the luxury of pausing operations to redesign the process. I get it. Deadlines, unexpected issues, schedule changes are all demanding attention with no sign of reprieve.

 

At first it can be tempting to push through and force the new process or organizational structure to work. But this can lead to reaching for a result when you need the focus on the *mechanism*.

 

The work must happen in real-time. It’s like changing the wheels on a car traveling 65 mph

without stopping, not the suggested method…. but it feels like it’s necessary to change the tire.

 

It’s not. Take the time to stop the car and safely change your tire!

 

When you can slow down enough to assess your current situation, observe what happens with the new process or system, it becomes clear what needs to be adjusted versus what works.

## What Sets You Up for a Successful Implementation?

 

It might sound obvious but a clear vision is the most important thing you can define. Often it requires intention and refinement that can feel like an inefficient use of time but it makes all the difference in the long-run.

 

Get everyone in the same room and take the time to create a well-defined process. Look at documenting an understanding of what is already working effectively. Alongside your process start the development of systems and structures that support the change.

 

Set up specific days to slowly go through the new changes and debrief after each step so no information is overlooked.

 

Take the polishing example, for instance. When looking for the root cause, I will cycle through questions like:

 

- Are the correct carriers being used?
- How often have you conditioned your pads?
- Were the parts lapped with fine enough grit?
- Were the edges machined and beveled correctly and with fine enough grit?
- Was the part sliced with no stress and warpage?

 

Rather than keep polishing more parts, they just need to take a few steps back and make sure all the previous operations yielded the best results.

## Bringing In the Right Expertise

 

Whether you’re new to my site or returning, welcome. I’m John Escolas and my mission is to help your business thrive in the optics and photonics industry. With over 20 years of experience, I've navigated every corner of this dynamic field. From hands-on engineering to leading operations and managing client relationships, my diverse background equips me to deliver consulting services that are not only expert but also perfectly aligned with your specific needs.

 

[Let's work together](https://escolasopticsconsulting.com/contact?hsLang=en) to achieve excellence and push the boundaries of what's possible in our industry.

## FAQs Section

 

### **How do I know if I should work with an optics consultant instead of hiring an engineer?**

 

A consultant is the faster choice when you have an urgent problem to solve. A new engineer usually needs about three months to learn your operation, and they often end up continuing the way things have always been done. As a consultant, I bring experience from many different shops and apply what works to your situation, so you get an outside view and a solution right away. You can learn more about the best options for you in [this blog](https://escolasopticsconsulting.com/blog/when-to-use-a-consultant-vs.-hire-full-time-in-optics-manufacturing).

 

### **What kind of expertise do you offer?**

 

I know how to get the part made. There’s rarely an optic I haven’t seen or fabricated before, so whether you’re struggling with yield, process capability or meeting a tough spec, I’ve most likely made that part or something close to it. I show your team the methods and best practices to make it reliably.

 

### **What types of clients do you work with?**

 

I work with companies that make glass optics, including a growing number of startups. Many of these companies are experts in later steps like coating or dicing, but they’re also responsible for fabricating the substrate. Glass fabrication isn’t their specialty, and more of them want to bring that work in-house instead of subcontracting it. I help them build that capability.

 

### **Do you work on-site or remotely?**

 

Both. It depends on where you need the support. Sometimes a 20-minute call or a quick text is all it takes, like a spec review when you’re deciding whether you can quote a job in-house. Other times I’m on the shop floor during a high-stakes run, such as a thin part with tight thickness tolerances or a job where the raw material is too expensive to scrap. Either way, my job is to give you the confidence to make the right call.

 

### **What does working with you look like?**

 

Most engagements start with one to two days on-site. I find the gaps between where you are and where you need to be, show your team what they are and help close them. Some clients have me back monthly or quarterly to keep progress on track, and one has me in every other week as part of their engineering staff. For clients farther away, like on the West Coast, I provide regular remote support by phone and video.

 

 

 

*Need support on an upcoming project? Schedule a [free consultation](https://meetings.hubspot.com/john-escolas)today.*

 

[View full post](https://escolasopticsconsulting.com/blog/can-you-implement-new-changes-while-keeping-daily-operations-at-full-speed)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "John Escolas"
  },
  "dateModified" : "2026-11-20T15:28:52.462Z",
  "datePublished" : "2026-11-20T15:22:21Z",
  "headline" : "Can You Implement New Changes While Keeping Daily Operations at Full-Speed?",
  "image" : {
    "@type" : "ImageObject",
    "height" : 1000,
    "url" : "https://46452374.fs1.hubspotusercontent-na1.net/hubfs/46452374/Escolas%20Blog%20Images.png",
    "width" : 2000
  },
  "mainEntityOfPage" : "https://escolasopticsconsulting.com/blog/can-you-implement-new-changes-while-keeping-daily-operations-at-full-speed",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Blog Listing"
  }
}
```